LIVE OPS · ACTIVE SITES 14 · ON-SITE TODAY 4,287 · ON-TIME 99.4% · LTIFR (12M) 0.21 UPDATED 14:32:08 GST
Q2 · 2026 FY26 mid-year ops report — now live

Construction operations,
in the open.

Forty-seven years of audited delivery across the GCC — civil works, fit-out, hospitality interiors, cultural projects. Now visible in real time, the way our clients ask for it.

Founded 1979 · Dubai, UAE
Tier Tier-1 · Privately held
Coverage UAE · KSA · Oman · Bahrain
ops.almadarmgm.ae / overview Q2 · 2026
Overview Sites Safety Velocity Compliance
Active projects ● ON-TRACK
14
+2 vs Q1
Manhours YTD
4.21M
+8.4% YoY
Delivery velocity
+12%
vs 12M baseline
Safety LTIFR
0.21
−0.04 QoQ
Project velocity · 24 weeks Actual   Plan
W14 · 04 APR W26 · 27 JUN W38 · 19 SEP
BUILD 2026.18.04 Refresh 15s · ● live
— Delivering for —
DCT Abu Dhabi Cultural · 4 projects
Emaar Hospitality · 6 projects
Aldar Residential · 3 projects
Mubadala Civic · 2 projects
RAK Hospitality Resorts · 4 projects
Sharjah Inv. Authority Cultural · 3 projects
— 01 / Capabilities

Eight disciplines, one general contractor.

From below-grade civil works to the final coat of marmorino. Self-perform where it matters; specialist subcontracting where it doesn't. Every line item routed through the same QA/QC and HSE backbone.

SCOPE BREADTH
8 / 8
UPDATED · APR 2026

Civil works

Below-grade, structural concrete, post-tensioning. RC frames up to 60 storeys.

CW · 01 ● ACTIVE

Fit-out

Cat-A & Cat-B, joinery, ceilings, partitioning, MEP integration. Studio-grade execution.

FO · 02 ● ACTIVE

Decorative finishes

Venetian plaster, tadelakt, micro-cement, hand-applied gilding, patinated metal.

DF · 03 ● ACTIVE

Hospitality interiors

5-star hotel keys, F&B, BOH. Operating-brand-standard programmes from Marriott to Aman.

HI · 04 ● ACTIVE

Cultural projects

Museums, galleries, heritage restoration. Conservation-grade material handling and IES.

CP · 05 ● ACTIVE

Infrastructure

Civic plazas, pedestrian decks, hard & soft landscape, utilities reticulation.

IN · 06 ● ACTIVE

MEP coordination

In-house BIM-led MEP for HVAC, fire, plumbing, low-voltage. Clash-resolved before mobilisation.

ME · 07 ● MONITORING

Façade systems

Unitised curtain walling, GRC, stone rainscreen. Coordinated with structure for minimal tolerance loss.

FA · 08 ● ACTIVE
— 02 / Live operations

The site, as it happens.

Every active site reports up. Pours, MEP coordination meetings, facade mock-up approvals, RFI closures, safety toolbox talks — written into the same audit log our clients see.

STREAM
14 sites · live
REFRESH · 15s
live-ops.almadarmgm.ae · tail -f /var/log/sites/*.log
SITES 14/14 EVENTS / MIN 38 UPTIME 99.97%
All sites · 14 Hospitality · 4 Cultural · 3 Civic · 2 Commercial · 3 Residential · 2
14:32:01 · MARSA-PVL · slab-pour Lvl-7 · 142 m³ · supplier RAK-Cement COMPLETE 14:30:47 · DIFC-TWR · MEP-coord-mtg · 11 of 14 disciplines signed 3 PENDING 14:28:12 · KHF-HOTEL · facade mock-up · panel-type B · client review APPROVED 14:24:53 · YAS-CULT · RFI-2026-0418 · joinery sequence Block-C CLOSED · 28h 14:21:20 · SHJ-LIB · toolbox-talk · working-at-height · 87 attendees SIGNED-OFF 14:18:09 · MARYAH-RES· QA-inspection · marmorino sample wall T-3 PASS 14:14:42 · DIFC-TWR · crane-3 · maintenance window · 90 min PLANNED · NO-DELAY 14:11:33 · MARSA-PVL · delivery · GRC panels · batch 18 of 24 RECEIVED 14:08:51 · YAS-CULT · heritage-stone delivery · Jordan limestone QA-CLEARED 14:05:14 · KHF-HOTEL · safety-walk · L-12 BOH · 0 findings · supervisor-K CLEAR 14:02:47 · SHJ-LIB · progress · facade unit-install · 218 of 312 +12 vs PLAN 13:59:18 · MARYAH-RES· ITP signoff · waterproofing podium · cons. eng. SIGNED — stream paused at 14:32:08 GST · auto-refresh in 11s
14 ACTIVE STREAMS · 4,287 ON-SITE · 99.97% UPTIME UPDATED 14:32:08 GST · TZ +04:00
Avg RFI close time
31.4 hrs
vs industry median 96 hrs (CIOB UAE benchmark, 2025)
Pour QA pass rate
99.6 %
cubes tested 28-day · 4,142 of 4,159 since Jan 2024
Audit-log retention
10 yrs
Immutable, signed, exportable. ISO 9001 conformant.
Active construction site at dusk
25.197° N 55.274° E DIFC · DXB
LIVE · 14:32 GST
— Site of the day · DIFC-TWR

Forty-two storeys of structure, on programme, on safety.

The DIFC tower fit-out is at level 28 today. 312 trade workers on site, two pours scheduled before sunset, zero recordable incidents in the last 184 days. The numbers are in the feed above — they're the same numbers we send the client at end-of-shift.

Project
DIFC-TWR
Programme
+4d ahead
RIR (12M)
0.00
— 03 / Selected projects

Six of fourteen, currently active.

A representative slice of the live portfolio. Status pills reflect last reconciliation against programme baseline; completion percentages are weighted-physical, not invoice.

PORTFOLIO VALUE
AED 3.84B
As at 18 APR 2026

Marsa Heritage Pavilion

● ON-TRACK
SectorCultural · Heritage
LocationSaadiyat · AUH
Year2024 — 2026
ScopeCivil + finishes
78%

DIFC Tower Fit-Out

● ON-TRACK
SectorCommercial · Cat-B
LocationDIFC · DXB
Year2025 — 2026
Scope42-storey fit-out
64%

Khor Fakkan Boutique Hotel

● MONITORING
SectorHospitality · 5-star
LocationKhor Fakkan · SHJ
Year2024 — 2026
ScopeShell + interiors
52%

Yas Cultural Hall

● ON-TRACK
SectorCultural · Civic
LocationYas Island · AUH
Year2025 — 2027
ScopeAuditorium build
31%

Sharjah Civic Library

● ON-TRACK
SectorCivic · Government
LocationAl Majaz · SHJ
Year2024 — 2026
ScopeCivil + facade + FF&E
88%

Al Maryah Residences

● COMPLETE
SectorResidential · Premium
LocationAl Maryah · AUH
Year2022 — 2025
ScopeTower + decorative
100%
— 04 / By the numbers

Forty-seven years, still counting.

Cumulative-since-inception where labelled; rolling-12-month otherwise. Every figure traceable to the audited system of record. Last reconciled 18 April 2026.

RECONCILED
18 APR 2026
SOURCE · ERP · IFRS
Years operating
47
since 1979 · founder-led
Projects delivered
280+
+12 in trailing 12M
Manhours worked
12.4M
since 2010 · audit-traceable
Programme adherence
99.4%
on-time · last 36M
Safety LTIFR
0.21
−18% vs prev. 12M
Active sites
14
UAE 11 · KSA 2 · OMN 1
On-site today
4,287
trade · 3,818 · supervision · 469
Repeat-client share
68%
+6pp vs FY24
Insurance · contract works
AIG · Lloyd's syndicate
AED 4.0B
Banking · commercial paper
A-rated · 4 institutions
AED 1.6B
Bonding capacity · single
Performance + retention
AED 850M
— 05 / How delivery works

Five stages, same playbook every time.

The shape of every project — from a museum in Saadiyat to a tower in DIFC. Tightly held methodology; flexible execution. Each stage has its own gate, sign-off, and audit trail.

METHODOLOGY · v3.4
since 2014
REV · JAN 2026
Brief

Brief

Scope, programme, brand standards, budget envelope. Two principals on every kickoff — never delegated.

2 — 3 weeks
Coordinate

Coordinate

BIM-led MEP & structural coordination, value engineering, supplier qualification. Clash-free before mobilisation.

6 — 10 weeks
Mobilise

Mobilise

Site set-up, hoarding, welfare, HSE induction, baseline programme issued, weekly cadence locked.

3 — 4 weeks
Deliver

Deliver

Civil → frame → envelope → MEP → fit-out → finishes. Weekly client reporting; live dashboard access from day one.

programme
Aftercare

Aftercare

12-month defect liability, snagging, callouts. Plus a non-contractual second visit at 24 months. Always.

12 — 24 months
— 06 / Sectors & clients

Where the work goes, who it goes to.

Sector mix is balanced by intent — never more than 35% of revenue from any single sector. Repeat-client work accounts for 68% of FY26 revenue, the highest in our history.

SECTOR MIX
7 sectors
FY26 BLEND
SectorProjectsRevenue shareStatus
Hospitality · hotels & resorts 68 ● ACTIVE
Cultural · museums & galleries 42 ● ACTIVE
Commercial · towers & offices 54 ● ACTIVE
Civic / Government 38 ● ACTIVE
Residential · premium 46 ● ACTIVE
Heritage & restoration 22 ● ACTIVE
Infrastructure · civic plazas 14 ● MONITORING
Selected clients · since 1979 12 of 80+
01 Department of Culture & Tourism — Abu Dhabi Cultural
02 Emaar Properties Hospitality
03 Aldar Properties Residential
04 Mubadala Investment Co. Civic
05 Miral · Yas Island Cultural
06 Marriott International Hospitality
07 RAK Hospitality Holding Resorts
08 Sharjah Investment & Development Authority Civic
09 DIFC Authority Commercial
10 Aman Resorts Hospitality
11 Saadiyat Cultural District Cultural
12 Dubai Holding Mixed-use
— 07 / Certifications & compliance

Audit-ready, by design.

ISO-certified across quality, environment, and occupational health & safety. Registered with every major UAE municipality. Approved contractor list participant for all listed federal entities.

NEXT AUDIT
14 OCT 2026
ISO 9001 · BV
ISO 9001:2015
Cert · QMS-AM-2009-44 · valid to 2027-03
Quality management. Audited annually by Bureau Veritas.
ISO 14001:2015
Cert · EMS-AM-2011-18 · valid to 2027-03
Environmental management. Site-by-site EIA programme.
ISO 45001:2018
Cert · OHS-AM-2018-09 · valid to 2027-03
Occupational H&S. LTIFR target ≤ 0.30 (12M).
BREEAM In-Use
Programme · 14 active certificates
Sustainability assessment for delivered assets.
LEED · USGBC
Programme · 8 platinum / 22 gold
Delivered LEED-rated projects since 2012.
Dubai Municipality
Reg · DM-CC-1979-021 · Class A1
Original 1979 registration. Class A1 unrestricted.
Abu Dhabi · DMT
Reg · DMT-AM-1984-114 · Special Cat.
Special-category contractor for cultural assets.
Emirates Authority · ESMA
Conformity · CoC-2024-AM-007
Materials conformity scheme — site-imported finishes.
— 08 / Leadership & trust

Held privately, run by the same family.

Two generations on the executive committee. No external shareholders, no PE overhang. The principals are personally on every project of meaningful scope — and have been since 1979.

OWNERSHIP
100% private
FAMILY-HELD
If we can't show the client what's happening on site, in real time, with the audit log they can hand to their own board — we're not actually doing the job. That's been the standard since '79. The dashboard just makes it visible.
Mohammed Al-Madar · Chairman & CEO · Al Madar MGM
Executive committee · 2026 3 of 7
Mohammed Al-Madar
Chairman & CEO

Founder, 1979. Civil engineer. Leads the executive committee and chairs every quarterly client review board.

since
1979
Yusra Al-Madar
Managing Director · Operations

Joined 2004. Runs the active-site portfolio and the operations dashboard programme. RIBA chartered.

since
2004
Ahmad Al-Madar
Director · Hospitality & Cultural

Joined 2009. Heads the hospitality and cultural delivery practice. Previously with Aman Group, Geneva.

since
2009
— 09 / Brief us

Brief us on your project.

Sector, scope, programme. One of the principals personally responds within two working days. RFPs encrypted in transit; NDAs returned same-day on request.

Email rfp @ almadarmgm.ae
Press press @ almadarmgm.ae
Studio Al Quoz Industrial 3 · Dubai
Hours Sun — Thu · 08:00 — 18:00 GST
Response ● within 2 working days