Civil works
Below-grade, structural concrete, post-tensioning. RC frames up to 60 storeys.
Forty-seven years of audited delivery across the GCC — civil works, fit-out, hospitality interiors, cultural projects. Now visible in real time, the way our clients ask for it.
From below-grade civil works to the final coat of marmorino. Self-perform where it matters; specialist subcontracting where it doesn't. Every line item routed through the same QA/QC and HSE backbone.
Below-grade, structural concrete, post-tensioning. RC frames up to 60 storeys.
Cat-A & Cat-B, joinery, ceilings, partitioning, MEP integration. Studio-grade execution.
Venetian plaster, tadelakt, micro-cement, hand-applied gilding, patinated metal.
5-star hotel keys, F&B, BOH. Operating-brand-standard programmes from Marriott to Aman.
Museums, galleries, heritage restoration. Conservation-grade material handling and IES.
Civic plazas, pedestrian decks, hard & soft landscape, utilities reticulation.
In-house BIM-led MEP for HVAC, fire, plumbing, low-voltage. Clash-resolved before mobilisation.
Unitised curtain walling, GRC, stone rainscreen. Coordinated with structure for minimal tolerance loss.
Every active site reports up. Pours, MEP coordination meetings, facade mock-up approvals, RFI closures, safety toolbox talks — written into the same audit log our clients see.
14:32:01 · MARSA-PVL · slab-pour Lvl-7 · 142 m³ · supplier RAK-Cement → COMPLETE
14:30:47 · DIFC-TWR · MEP-coord-mtg · 11 of 14 disciplines signed → 3 PENDING
14:28:12 · KHF-HOTEL · facade mock-up · panel-type B · client review → APPROVED
14:24:53 · YAS-CULT · RFI-2026-0418 · joinery sequence Block-C → CLOSED · 28h
14:21:20 · SHJ-LIB · toolbox-talk · working-at-height · 87 attendees → SIGNED-OFF
14:18:09 · MARYAH-RES· QA-inspection · marmorino sample wall T-3 → PASS
14:14:42 · DIFC-TWR · crane-3 · maintenance window · 90 min → PLANNED · NO-DELAY
14:11:33 · MARSA-PVL · delivery · GRC panels · batch 18 of 24 → RECEIVED
14:08:51 · YAS-CULT · heritage-stone delivery · Jordan limestone → QA-CLEARED
14:05:14 · KHF-HOTEL · safety-walk · L-12 BOH · 0 findings · supervisor-K → CLEAR
14:02:47 · SHJ-LIB · progress · facade unit-install · 218 of 312 → +12 vs PLAN
13:59:18 · MARYAH-RES· ITP signoff · waterproofing podium · cons. eng. → SIGNED
— stream paused at 14:32:08 GST · auto-refresh in 11s
The DIFC tower fit-out is at level 28 today. 312 trade workers on site, two pours scheduled before sunset, zero recordable incidents in the last 184 days. The numbers are in the feed above — they're the same numbers we send the client at end-of-shift.
A representative slice of the live portfolio. Status pills reflect last reconciliation against programme baseline; completion percentages are weighted-physical, not invoice.
Cumulative-since-inception where labelled; rolling-12-month otherwise. Every figure traceable to the audited system of record. Last reconciled 18 April 2026.
The shape of every project — from a museum in Saadiyat to a tower in DIFC. Tightly held methodology; flexible execution. Each stage has its own gate, sign-off, and audit trail.
Scope, programme, brand standards, budget envelope. Two principals on every kickoff — never delegated.
BIM-led MEP & structural coordination, value engineering, supplier qualification. Clash-free before mobilisation.
Site set-up, hoarding, welfare, HSE induction, baseline programme issued, weekly cadence locked.
Civil → frame → envelope → MEP → fit-out → finishes. Weekly client reporting; live dashboard access from day one.
12-month defect liability, snagging, callouts. Plus a non-contractual second visit at 24 months. Always.
Sector mix is balanced by intent — never more than 35% of revenue from any single sector. Repeat-client work accounts for 68% of FY26 revenue, the highest in our history.
| Sector | Projects | Revenue share | Status |
|---|---|---|---|
| Hospitality · hotels & resorts | 68 | 31.4% | ● ACTIVE |
| Cultural · museums & galleries | 42 | 22.8% | ● ACTIVE |
| Commercial · towers & offices | 54 | 18.6% | ● ACTIVE |
| Civic / Government | 38 | 12.1% | ● ACTIVE |
| Residential · premium | 46 | 9.4% | ● ACTIVE |
| Heritage & restoration | 22 | 3.8% | ● ACTIVE |
| Infrastructure · civic plazas | 14 | 1.9% | ● MONITORING |
ISO-certified across quality, environment, and occupational health & safety. Registered with every major UAE municipality. Approved contractor list participant for all listed federal entities.
Two generations on the executive committee. No external shareholders, no PE overhang. The principals are personally on every project of meaningful scope — and have been since 1979.
If we can't show the client what's happening on site, in real time, with the audit log they can hand to their own board — we're not actually doing the job. That's been the standard since '79. The dashboard just makes it visible.Mohammed Al-Madar · Chairman & CEO · Al Madar MGM
Founder, 1979. Civil engineer. Leads the executive committee and chairs every quarterly client review board.
Joined 2004. Runs the active-site portfolio and the operations dashboard programme. RIBA chartered.
Joined 2009. Heads the hospitality and cultural delivery practice. Previously with Aman Group, Geneva.
Sector, scope, programme. One of the principals personally responds within two working days. RFPs encrypted in transit; NDAs returned same-day on request.